Rock BlastingHillside plot leveling
A residential plot cut into hard granite where conventional excavation could not reach formation level.
- Scope
- Survey, blast design, vibration monitoring, muck removal — 320 cumulative blast events.
- Challenge
- Two neighbouring houses within 40 m and a buried water line along the boundary.
- Outcome
- Vibration held at 4.2 mm/s — under half the agreed limit. No structural complaint, plot handed over level in 6 weeks.